Back to list

SPS Fauldhouse

As part of an asset improvement programme Emtec Energy were appointed to design, supply and install this 100kWp ground mounted system for the Scottish Prison Service.

Emtec Energy delivered a full turnkey service, including DNO liaison, system design, procurement, installation and commissioning.

This fully optimised, Solar Edge system was installed on ground screws, as opposed to traditional driven piles. This led to lower costs and a shorter installation time, with reduced impact on the local environment.

Project Statistics